Current Charges for Services

Residential Water Rates

2023 2024 2025 2026 2027 2028 2029
First 2,500 gallons 16.95 18.31 18.68 19.05 19.43 19.82 20.23
Next 2,500 gallons/per 1000 6.46 6.98 7.12 7.26 7.41 7.56 7.71
Over 5,000 gallons/per 1000 6.80 7.34 7.49 7.64 7.79 7.95 8.11


Commercial Water Rates

2023 2024 2025 2026 2027 2028 2029
First 20,000 gallons 117.16 126.53 129.06 131.64 134.27 136.96 139.70
Over 20,000 gallons/1000 6.46 6.98 8.00 8.16 8.32 8.49 8.66

 

Irrigation Rates Residential and Commercial

2023 2024 2025 2026 2027 2028 2029
First 2,500 gallons 16.99 18.35 18.72 19.09 19.47 19.86 20.26
Next 2,500 gallons/per 1000 6.46 6.98 7.12 7.26 7.41 7.56 7.71
Over 50,000 gallons/per 1000 8.00 8.16 8.32 8.49 8.66

 

Residential Sewer Rates

2023 2024 2025 2026 2027 2028 2029
Flat Fee 53.21 57.47 58.62 59.79 60.99 62.21 63.45

Commercial Sewer Rates

2023 2024 2025 2026 2027 2028 2029
0 -15,000 gallons 101.79 109.93 112.13 114.37 116.66 118.99 1121.37
15,001 -50,000 339.30 366.44 373.77 381.25 388.88 396.66 404.59
50.001 -100.000 679.68 734.05 748.73 763.70 778.97 794.55 810.44
100,001 – Over flow based TBD TBD TBD TBD TBD

All bills are due when rendered, and become delinquent after the 20th of the month. A penalty of 10% will be added to all delinquent bills. Service will be disconnected if bill is not paid by the 30th. A service charge will be added if payment is not received before day of cut-off. Meter readings & consumption in 100 gallons.

New Service Installation Residential
  • New Account Fee For All New Accounts $50.00
  • 3/4" meter with impact fees paid 961.00
  • 3/4" meter with no impact fees paid 1,243.00
  • 1" meter 1,539.00
  • 1" meter with no impact fees paid 1,845.00
  • 2" meter cost
Meter Deposit Residential
  • 3/4" meter $100.00
  • 1" meter 100.00
  • 2" meter 500.00
The Board of Directors of the Harvest-Monrovia Water, Sewer and Fire Protection Authority approved for Impact Fees to be paid on all residential irrigation water meters. This action was taken at the April 13, 2010 Board Meeting. The Impact fee will be same as Impact fees on residential lots for development. Currently this fee is $1,059.00 and will increase annually same as all other fees. This charge will be effective May 1, 2010. Meter cost and deposit will be determined by size of meter requested. Miscellaneous Charges
  • Service charge added if not paid by 4:30 p.m. the day BEFORE cut off $40.00
  • Turn on fee due to non-payment after hours 75.00
  • Returned check fee 35.00
  • Broken or cut locks 100.00
  • Lowering or raising meter for landscaping 150.00
  • Re-read meter if previous reading correct 15.00
  • Replace broken curb-stop 150.00
  • Replace broken backflow 150.00
  • Re-set meter for non-payment 150.00
  • Replace stolen or frozen meter 200.00
  • Relocating meter 500.00
  • Digging up service for non-payment 500.00
  • Unauthorized use of water (Fine) 500.00
  • Tampering with any part of water system (Fine) 500.00
  • Meter box & lid (picked up)WATER AND SEWER 75.00
  • (installed by company)WATER AND SEWER 150.00
  • Meter box lid only WATER AND SEWER 30.00
  • Round lids for septic tanks at house (installed) SEWER 75.00
  • Fire Hydrant Installation 3250.00
A $1,732.00 per unit impact fee for each unit at any commercial development. A unit is described as being no more than 300 gallons of water per day or a physical building divided for leasing or per one (1) acre. Fees and units will be determined by the General Manager of the Authority. Apartments and Townhouses will pay $1,059.00 per unit impact fees same as residential lots. Meter fees will be the same as residential meter fees. The per unit impact fees shall be paid in advance at the time of preliminary plan approval. Any complex using a 6" or larger meter shall pay an additional $6,939.00 large meter impact fee. If the meter is used for apartments or multi-unit facilities there shall be an additional $282.00 per unit meter fee before water is made available. Each unit is defined above. All fees and units will be determined by the General Manager of the Authority. Water meter installation charges for commercial development will be as follows:
  • New Account Fee for all new accounts $50.00
  • 3/4″ meter $ 1,249.00 plus $100.00 deposit
  • 1″ meter 1,539.00 plus $100.00 deposit
  • 2″ meter cost plus $500.00 deposit
  • 6″ meter cost plus $500.00 deposit
  • 8″ meter cost plus $500.00 deposit
All meters will be paid in full before actual installments. Annually, October 1, there will be at least two percent (2%) increase on all water and sewer impact fees, tap fees, inspection fees, connection fees, trunk line charges and all other fees that may be implemented in the future including both residential and commercial charges. Increase could be more if deemed necessary by Board. Annually, January 1, there will be at least two percent (2%) increase for water and sewer monthly service charge rates, including both residential and commercial. Increase could be more if deemed necessary by Board. There is a $424.00 per lot connection fee for sand filter sewer system. This will be paid when application is made for water service to a lot. An inspection fee of $134.00 will be due at the time of application for water. This fee will cover 4 inspections for tank installation on sand filter systems. After  the 4th inspection visit a charge of $131.00 per visit will be due and payable before additional inspections will be made. There is a $3,531.00 per lot connection fee for conventional sewer service. This will be paid when application is made for water service to a lot. Installation of Fire Hydrant at customer request or installation of fire hydrant for commercial building. Cost of this installation is $3250.00.